投稿ビュー

Boris Johnson's English Channel bridge: an engineering expert's view - The Conversation UK

The Conversation UK

Boris Johnson's English Channel bridge: an engineering expert's view
The Conversation UK
It is mostly a conventional bridge made from columns sunk into the seabed, although it has a cable-stayed section. The bridge is 165km long (just over 100 miles) but the short distance between the columns would not do for the busy Channel. A bridge ...

and more »
Admin 20.01.2018 0 77
コメント
順序: 
各ページ:
 
  • コメントはまだありません。
投稿情報
20.01.2018 (2666日前)
評価
0 0
おすすめ
カテゴリ
LNG GAS (89385 投稿)
就活 (9403 投稿)
焼却プラント (84377 投稿)