Marion County Board to Do Cost Study and Two Engineering Studies WJBD Online The board approved a $6,720 contract with WRF Engineering to look at the replacement of the rooftop air handling system that is now 40 years old. Building Committee Chair Dr. Creighton Engle says the current air conditioning system is in need of repair ... |