投稿ビュー

MassDOT picks engineering firm for next phase of Route 79/Davol Street corridor project - Fall River Herald News

MassDOT picks engineering firm for next phase of Route 79/Davol Street corridor project
Fall River Herald News
FALL RIVER — A contractor for the 25 percent preliminary design of the Route 79/Davol Street Phase II corridor improvements project was selected Wednesday by the state transportation architectural and engineering board, officials said. TranSystems Corp.

Admin 08.06.2017 0 92
コメント
順序: 
各ページ:
 
  • コメントはまだありません。
評価
0 0
おすすめ
カテゴリ
LNG GAS (89385 投稿)
就活 (9403 投稿)
焼却プラント (84377 投稿)