McDermott wins engineering pipeline contract with Petrobras Seeking Alpha MDR says the scope of work includes design and detailed engineering, procurement, construction and installation of six miles of a 24-inch rigid concrete coated pipeline from the already installed shallow water segment of the new pipeline system to the ... |