投稿ビュー

Tunnel needed to get Lake Ouachita water, engineer says - Hot Springs Sentinel
Tunnel needed to get Lake Ouachita water, engineer says  Hot Springs Sentinel

Boring a tunnel 300 feet under Blakely Mountain would enable water from Lake Ouachita to gravity flow to a treatment plant off Amity Road, an engineer told the ...

Admin 12.01.2019 0 83
コメント
順序: 
各ページ:
 
  • コメントはまだありません。
評価
0 0
おすすめ
カテゴリ
LNG GAS (89385 投稿)
就活 (9403 投稿)
焼却プラント (84377 投稿)